Concrete Piers. A concrete parking lot is really nothing more than an exterior slab on ground (or slab on grade). This degree of slope is more suited to a downslope configuration. Water will find a way out of a concrete slab. Each shall extend around two meters in the south side. 3) Excavate the trench allowing for room underneath and on both sides of Slot Drain®. The measurements acquired can then be used to estimate the amount of concrete required. Condition of Existing Concrete: Any concrete slab that will be overlaid with pavers must be structurally sound with no evidence of cracking or deterioration. For this to be feasible, the contractor needs to pour at least 2 inches thick, use smaller aggregate, and incorporate reinforcement such as welded wire mesh or fiber mixed into the concrete. Shim spacing can be about 4 times the depth of the battens. Installing a slab floor also puts you at the mercy of nature and the plumbing inspector. In short, the mason will drill holes in your concrete and pump extra concrete around the cracked area until the surface is flat. Apply 5,000 psi polymer concrete grout, at a slope consistent with the customer’s requirements. This material acts as a shock absorber, absorbing the stress from the slab's movement. Remove the concrete and put in a smaller patio. You can use a 3, 4, 5 formula (or 6, 8, 10 formula). In fact, the cost for mudjacking is very. In the 1980s, dramatic changes swept the concrete floor industry. h·1049 plastic barrel 38. How to best pour a level concrete floor over the existing sloped concrete floor for a garage conversion into living space. Level the line and measure the change in height from the line to the ground. Made of tough, long lasting PVC, the DECK-O-DRAIN system resists wear and is non-corrosive. Then the slab should have the required drainage below. Shower floors, laundry areas, entryways, garage floors and patios are all areas where the floor may have a drain built in to help the floor drain water to a. Start placing the concrete at one corner of the form while a helper uses a shovel or hoe to spread it (above). Finalize the drain layout, and specify style/size/material for new drains. There should be a sewer clean-out fitting by the wall facing the street or it might face a driveway. Would you recommend that we just eat the cost for the wedi/kerdi and DIY, or pay someone to do a mortar bed?. OPTION B - EXISTING CONCRETE (no sloped underlayment), or POURING A NEW SLAB. Mud jacking can lift a settled concrete slab by pumping a grout through the concrete and pushing it up from below. Measure the perimeter of the area to pour the concrete over the existing slab. Whether a simple pole barn or an elaborate barndominium, shouse or post frame home, there are some challenges when it comes to constructing on an existing concrete slab on grade. Concrete slab shall be a minimum of 3 1/2" thick with the perimeter of the slab 8" thick, and 6" wide poured in a monolithic manner. One side is about 4. Shed base on existing concrete slab - advice please. There are, however, certain basic steps that apply to building most concrete ramps. thin and thick shells and. Concrete Finally, the concrete for the slab (and footing if combined) was placed, compacted, floated, then mechanically steel trowelled to a level, smooth finish. Draw a slab. From a structural standpoint, low-slump concrete is good. Backfill slope transition at wings is determined based on skew angle of box culvert. Prepare the exposed concrete by wet sandblasting, water blasting, or shot blasting. This is not the most recommended solution, but it can result in a successful paver patio. Expansion joints are cuts in concrete slabs, or the joints between walls and concrete slabs, that go completely through the slab to the base material. Mortex's concrete topping products are the premier choice for many applications today. (image 1) B. Slab-On-Grade. Have the soil tamped down and a 12" gravel base compacted on top 3" at a time. The following slumps for normalweight concrete are suggested: less than 30-degree slope--2- to 4-inch slump; 30- to 45-degree slope--1- to 3-inch slump. It's gently sloped to guide water back to the street. see the appropriate standard sheets for dimensions of frames and grates. Building a deck flush with an existing concrete patio with a slight slope 08-14-2017, 04:54 PM Building a deck off of my back patio, the slab is sloped away from the house. In many cases, facility builders and managers have to work around pre-existing concrete flooring to install their trench drain systems. If you would like a complete step-by-step of the entire process with all the little idiosyncrasies and details I now have manuals describing the complete process for you from bare wall studs all the way up to a completely waterproof shower substrate for your tile. You could put gravel to bring grade to where you want it with a 4" slab. Precast Concrete Slab "slab": The top layer of pre-cast concrete slabs that are placed upon the leveling sand. A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Try mixing about 1 fl oz (30 mL) per. Anyway you can attach the walls of the shed to the concrete using 3/8" anchors. Cut the existing garage floor to the bottom plate of the existing walls and remove it all. Putting hot tub on sloped concrete slab My coworker has a 12 foot slab off the patio door of his basement, on which he wants to put a hot tub. For more serious slope. If the architect required a 1% slope and that is the slope you poured, within the 72-hour window and before the shores are removed, the general contractor and developer have no grounds to complain. Concrete Pier: The concrete pier foundation is typically used on sloping ground. 2 Strength of the Existing Pavement. It swings outward and can hinge left or right. The area to be covered is currently 50% concrete patio, that’s in great condition. At first glance you might think a concrete slab would be the ultimate floor and foundation system for your new shed. Made of tough, long lasting PVC, the DECK-O-DRAIN system resists wear and is non-corrosive. shows a safe room installed on an existing slab-on-grade that meets the designed thickness and reinforcing, while Figure 2 shows a safe room installed on a new foundation required because the existing slab-on-grade did not meet the thickness or reinforcement requirements to resist all applicable loads. In addition the MEP trades need to coordinate with the Mat Slab contractor to allow for any underground utilities that need to be installed prior to the concrete pour. Grinding concrete Mixing floor leveling compound. Required Tools for this Project. Shovel off excess concrete in front of the screed or fill in low spots. Door slab desk wood slab doors solid slab door interior. 5 water to cement ratio, which provides a denser concrete and hence increases the wear ability. When looking at the house, facing West you will see that the slab is properly sloped in the yard, going north. This degree of slope is more suited to a downslope configuration. If you need to fill in a big hole, you can break the concrete into small pieces and use it for fill. The specifications for each ramp are unique, so there are no one-size-fits-all plans. The slab remains in its original position, 12" below the top of the stem wall, but the footing is moved down to accommodate the increased stem wall height. Try to make the outline of the mesh tool as simple as possible (in the example a rectangle)(image 2). If you’ve gone with the raised floor alternative, you simply adjust the height of the piers or stem walls. The following descriptions and photos illustrate the concrete work done including pouring a concrete slab with an apron and walkway to the house. I have a sloped slab (slopes for water draining purposes). The slab could be for an entire home, it might be an exterior patio slab, a front porch slab, a driveway, etc. I have a sloped slab (slopes for water draining purposes). There would be less material (thus creating a lesser drop/slope) near the house and the furthest point away from the house will have an additional width of material and would allow for the sheeting to drop lower and create a more substantial slope. Joint spacing normally ranges between 10 to 18 feet depending on the amount of reinforcement the slab has. A slab foundation is made of concrete that is typically 4"-6" thick in the center. Concrete needs to be mixed on a clean hard surface, such as an existing concrete slab or on a piece of board. - Saw-cut the perimeter, as close as you can get to the edge. Over a concrete slab, I would not use wood as the curbI'd use brick, pavers, or a premade, tileable curbtwo reasons, treated wood tends to be quite damp as delivered and can twist into a pretzel and crack as it dries out. Hi there I have layed many of patios on existing patios, concrete slabs. Once the concrete has lost its sheen, go over it with a wood. once the Gunite is in, we’re planning to have travertine pavers put down. I laid a DIY concrete slab that will serve as a new spot for visibly hiding my city's ugly trash bins from the front street and help curb appeal. In a few cases, the interlocking concrete pave-ment may abut an existing concrete slab. There are lots of different kinds of concrete ramps. Slab jacking is one method that can correct the tilt of an entire concrete slab floor. So really, if you had no base, once put it up you will have the roof and the walls and no floor. If it was #2, with the perimeter of the garage being the elevation as the house slab, then I would not have as much head-scratching going on. Second floor concrete slab wall section detail. Some specifications still take this tolerance approach, even though there. Concrete is an amazing material, but it has an Achilles heel. Seems like a wet floor. 4 Where rainfall can be heavy, use a fine-tooth trowel to apply cold, cut-back asphalt mastic over the entire slab (use about one gallon per 100 square feet of floor). I am going to replace my current shed which sits on a concrete pad. Use the flat side of a metal trowel to feather the edges of the leveling compound flush with the rest of the patio. A slab foundation is made of concrete that is typically 4"-6" thick in the center. The acid is strong, so dilute it first, mixing 1 part acid in 3 parts water. Provision of a concrete slab cover may not be necessary. Slope: The existing concrete pad must slope away (min 1" of fall for 8 feet of run) from any structures to ensure drainage. Concrete international / January 2011 35 by Mark a. This will allow you to pour your concrete floor to have the 2" pitch. Concrete Basics; grading, forming, finding the correct slope Concrete can be difficult and expensive. Solution # 1:. Use it to level the wet concrete by pulling it from the house toward you while working the board side to side-a process called ‘screeding. Concrete Curb On Existing Slab-Typical - PlanMarketplace, your source for quality CAD files, Plans, and Details PlanMarketplace Buy and sell CAD details online. For example, to pour a slab on a slope, you have to cut into the hillside, erect retaining walls, and use fill to level the site. Summary: A crawl space foundation has several advantages over basements and concrete slab foundations and is a way to save money when building a new home. Make sure to provide a slope to the surface in order to allow for water drainage. Follow these instructions and you can do the job. Pipe is cheaper than foundation repair. Square slate tiles are most commonly used for building outdoors, but a patio made with different sizes and shapes of stone can be more appealing in a less structured outdoor area. If you are lucky enough to have a sloped lot, your task of establishing grade can be accomplished. I did confirm that the walls were below the existing concrete before the new patio was poured, so I did not bring it up other than asking 10 times if the pool was low enough, this is why I hired someone and did not do it myself. Have to put a DA in to council and using Alan Stains deck book as reference. Posted by 3 years ago. 7 mm) from end to end, then the actual application will be 1/4″ (6. Putting hot tub on sloped concrete slab My coworker has a 12 foot slab off the patio door of his basement, on which he wants to put a hot tub. Slab on grade foundation detail. how to build a deck over an existing patio slab with low clearance. A yard of concrete delivered will be around $160. The following five-part series gives a basic overview of building a shower floor for tile. Install foundation drains: This is a fairly major repair which entails removal of all or portions of your existing basement slab. You can also use a cement mixer if available. fluid applied waterproofing at existing concrete wall existing concrete pilaster beyond wrapped with typical painted aluminum composite panels reveals and attachment trim 1 1/2" furring with 1 1/2" rigid insulation acoustical tile ceiling @ 8'-0" a. I admit I am a bit of neat freak, but the idea of have a nice concrete floor in the crawl space appeals to me. How to slope existing concrete slab. The whole footing and slab system is constructed on top of the ground. The bulk of the work for a new slab is in the excavation and form building. I have a sloped slab (slopes for water draining purposes). The three main causes of settling are, poor initial compaction, excess water and the break down of organic material in soils. It is best to have the shell of your pole barn completed before you pour a concrete slab. New concrete next to existing foundation. The traditional and more popular way to level your concrete slab is through mudjacking. Jackhammer 3” of concrete under the future shower floor. All damaged, loosened, or unbonded portions of existing concrete should be removed by chipping hammers or other mechanical methods. Advance the screed in a sawing motion, removing the excess concrete in front of the board and using it to fill any dips behind it. - wilsjd Mar 8 '16 at 4:51. New drains must be installed to direct water to a sump pump, and then a new slab must be installed. To edge the cement, begin by running a mason's trowel between the concrete and the outer edges of the slab form (above-inset). Thoroughly dampen the gravel. But remember to leave them higher than the proposed depth of your riser. Once the concrete’s poured, the concrete is vibrated to bring air bubbles to the surface, and is then carefully smoothed out and levelled in various stages using different tools - first with a screed, then with a long-handled tool called a bull float and. How to slope existing concrete slab. 2019 · Step 1, Use a power washer to remove dirt and loose concrete. Place a level against the edge of the post and adjust the post until it is plumb. Overpouring or almost any other kind of fix will not be permanant. Place the first paving slab down in one of the corners and gently tap it into position using a rubber mallet so it's firmly seated in the cement and the edges aren't crooked. Fill the form from the high side toward the down slope, placing your cut rebar in crisscross patterns every 8 to 12 inches, and ensuring no. Second floor concrete slab wall section detail. 5% or higher, the slab might be unsuitable for laminate, even with a vapor barrier. Set another support at the edge of the area you need to add concrete to as well. Where the base of the ramp meets the existing concrete it gets pretty thin. Use a step trowel (a drywall corner knife works as well) to work the corners smooth. They consist of a perimeter footing (edge beam) and a series of narrow internal beams (strip footings) at one metre nominal centres running each way. A yard of concrete delivered will be around $160. Discussion in As well as the fact the house currently has this type of floor as it's built on the slope. Concrete decks must be dry and primed with an asphaltic primer, then roof insulation shall be mopped with continuous coverage of hot asphalt to the concrete deck. even if we removed the austere concrete slab, the patio door threshold. Concrete - Volume Estimate - Estimate required concrete volume per sq. And, on the high end, you could have to pay up to $5,000 or more for a replacement slab. Excavation material will be distributed on site. Cut the existing garage floor to the bottom plate of the existing walls and remove it all. In addition the final grading of any surrounding dirt coming up to the slab/foundation should be BELOW the slab level and should slope away and down as it gets farther from the edge of the new house line. This beam will not deflect additionally when the remainder of the slab is cast, due to the added stiffness of the cured slab. (3) The slab shall be reinforced with 10M bars spaced not more than 200 mm o. Building a redwood deck over an existing concrete slab is an easy Slab sloped for drainage. Compact and level the whole area to be concreted, allowing for a slight slope away from buildings for drainage purposes. Do I need to grade the sand and gravel sub-base at the same slope so the slab can have a uniform 4-inch thickness? A. - wilsjd Mar 8 '16 at 4:51. You could go outside the pool perimeter by a foot or so on the low side and lay down some 2x4's to help hold the rock in place. In general, older slabs tend to be thinner and have less steel reinforcing than newer slabs. Continue to pump grout into the holes a little at a time until slab starts to rise up. Good Question !!!!!. 3 Clean the surface of the slab thoroughly, then apply a coating of asphalt primer to help the asphalt cement bond. If you'll be pouring new concrete to replace a weathered, crumbling, cracked driveway or patio slab, however, leave the edge jagged and jutting out by an inch or two, as it'll give the new. Try mixing about 1 fl oz (30 mL) per. You could put gravel to bring grade to where you want it with a 4" slab. What I have seen is people are reducing the water in Concrete mix and doing the co. When I put a bubble level on it, the bubble is about 2/3 between the lines, 1/3 outside the lines. The concrete slab is darkened and slick. Concrete slab on sloping ground. One Minute Quickie Videos. If you would like a complete step-by-step of the entire process with all the little idiosyncrasies and details I now have manuals describing the complete process for you from bare wall studs all the way up to a completely waterproof shower substrate for your tile. Question on sloped concrete sidewalk I have a sidewalk beside the house that is slanting towards the house so when it rains the basement gets wet. This can prevent damage caused by a pre-mix concrete truck. The skin is very thin and a couple of power washes later, the stone (or aggregate) in the slab becomes visible and unsightly. Re: Curbless Shower On Concrete Slab Do you know what style drain is being installed and its location relative to the existing? Most cureless showers are a single slope at ¼" in 12". Try to make the outline of the mesh tool as simple as possible (in the example a rectangle)(image 2). 25 inches) higher than our existing dinning room floor. - wilsjd Mar 8 '16 at 4:51. My husband Harrison and I have wanted to change out our patio floor since the day we bought the house. Whether you're filing in a crack, repairing a section of concrete, or pouring a whole new layer over an existing layer of concrete, getting the new concrete to adhere to the old layer can be difficult if. Scarify the existing concrete slab to a uniform rough surface having a chipped appearance suitable for bonding a concrete overlay. Slab on grade foundation detail. The bulk of the work for a new slab is in the excavation and form building. Wooden pivot door detail fences gate garage door decoration. A concrete slab has many positive attributes as a shed foundation, but it's a very labor-intensive undertaking. Water will find a way out of a concrete slab. To get a nice, flat surface that’s perfectly sloped, find a straight 2×4 that’s a foot longer than the width of the form and set it on top of the form as you start pouring the concrete. Door slab desk wood slab doors solid slab door interior. You will also need some type of steel reinforcing in the garage floor slab portion similar to what is described above in the Type 1 Garage Foundation. How to Adhere Concrete to Concrete. Laying a concrete slab could be the most challenging part of building a garden shed. (3) The slab shall be reinforced with 10M bars spaced not more than 200 mm o. Keep it damp for a couple of weeks. Thoroughly dampen the gravel. There should be a sewer clean-out fitting by the wall facing the street or it might face a driveway. The long side has a slope of approximately 1/16 - 1/8th of an inch per foot. Depending on the use of the building, the slab can then be finished ready for use, or receive a screed suitable for a floor finish. It is very hard to get new concrete to adhere to old concrete. Mix thin-set mortar according to directions. ETA: just form, drill and pin a new section where the front wheels will be or part way back, it doesn't necessarily have to taper to nothing, it could be level to about a foot from where you want it and then slope down to the existing slab. (looks like a carport but bigger) We've been told that we need footings in order to get a permit to keep it otherwise we have to have it dismantled (its a long story why we didn't get a permit first). To create a 6" curb, or stem wall above the slab, set this value to 6". For this to be feasible, the contractor needs to pour at least 2 inches thick, use smaller aggregate, and incorporate reinforcement such as welded wire mesh or fiber mixed into the concrete. If your slab is 24'x24',you should be fine with two cuts;one from east to west,and one from north to south effectively giving you four 12'x12. Depending on if you do it yourself or hire someone. The objective of this piece of paper is to provide a layer of moisture-inhibiting protection on top of the wood so that when you put the first layer of your deck mud in place to slope to the drain, the wood does not soak up the. Upon first checking out the home/basement, I noticed that there is a slope to the floor in the basement. Deck Over Concrete - California Redwood Association. The concrete slab is darkened and slick. The suspended reinforced concrete slab is tied into the external capping beam at floor level. Both of these types of joints, while very different, help take stress off of the concrete slab. Joints over a dry bed can be filled with sand or can be planted between with groundcover, or can be mortared for a smooth, solid surface. To hide the repairs if you decide to go this way is to clean and apply a thin slurry over the entire deck slab after you build up the low spots. Concrete Topping Slab Over Concrete Slab On Grade. Joints shall be spaced at 24 to 36 times the slab thickness but this need to be confirmed by a structural engineer. Water will find a way out of a concrete slab. Is it possible to build a brick wall along the boundary of the existing concrete or would we need to break it up and lay new foundations?. My coworker has a 12 foot slab off the patio door of his basement, on which he wants to put a hot tub. Some specifications still take this tolerance approach, even though there. Slabs with a lot of slope were intended to always be outdoors and the slope was intended to keep rain from standing on the slab. The good news is that we carry an array of post brackets to mount fence posts to concrete. Upon first checking out the home/basement, I noticed that there is a slope to the floor in the basement. Total area 800 sqft. I have used this technique many of time's and I have never had any problems. 1 to 1 5/8th inch diameter holes are drilled through the sunken concrete block/slab at strategic locations to maximize lift. Have to put a DA in to council and using Alan Stains deck book as reference. Last week I had the opportunity to help a friend build the foundation for a new shed that will be delivered in a couple of weeks. To ensure that water collects and flows to a lower elevation away from your site, a drainage slope can often be the answer. The total cost depends on the size, condition of the soil, location, and whether it's a monolithic slab, stem wall slab, or a raft foundation. To hide the repairs if you decide to go this way is to clean and apply a thin slurry over the entire deck slab after you build up the low spots. My question is do I cut my studs different lengths so that the top plate is level or all of the same length. Second floor concrete slab wall section detail. Incorporate a system or rebar into each tube extending throughout the slab. You will also need to deal with sealing your cinder blocks to both the existing concrete slab as well as the columns which will be frequently interrupting your cinderblock wall. Concrete Grade N20 6. Brock PaverBase panels will then spread load over that base to help ensure your patio stays level and smooth for years. The key to success was: 1) cleaning the existing surface to ensure good adhesion, 2) installing adequate steel reinforcement to the slab, 3) wetting the existing concrete surface before pouring, and 4) wetting the new concrete periodically after it sets so the concrete cures to the highest strength possible. We have a large existing concrete pad that we'd like to put an above ground pool on. Kelly, your #1 description of the slab is accurate: 3-1/2” step down from the house to the utility; 3-1/2” step to the parking area, 2” slope to the apron. Slab jacking is one method that can correct the tilt of an entire concrete slab floor. So I am tearing up the existing rotting OSB deck top. How to Pour a Concrete Slab for a Shed in 12 Easy Steps. I agree with William. The water will quickly become a thick concrete soup from the dust. Follow these instructions and you can do the job. The costs are higher for this foundation because it requires using concrete for the piers and a wood framed floor for on top of the piers. Hydraulic cement-based concrete. 3 Clean the surface of the slab thoroughly, then apply a coating of asphalt primer to help the asphalt cement bond. When you pour the concrete, place a metal anchor at each post location while the concrete is still fresh. mar 28, 2007. To prevent moisture from rising to the top, a vapor barrier of plastic is installed under the slab prior to pouring the concrete. h-1046a protective tree barrier 36. His back yard has a bit of a slope, and it would take too much concrete to pour a slab (read how to pour a concrete shed foundation here). Total area 800 sqft. Consider using a power washer to blast away any loose cement or sand particles, dirt, algae or mold. Door slab desk wood slab doors solid slab door interior. being trapped between the reinforced concrete roof structure and membrane. Anyway you can attach the walls of the shed to the concrete using 3/8" anchors. A concrete floor is prepped for self-level toppings by grinding or shot blasting followed by the application of a primer. Construct a concrete slab, 6 inches (150 mm) thick, extending over the embankment area under a bridge from the face of the abutment down to the toe of the slope and extending a minimum of 3 feet (1 m) beyond the outer edges of the superstructure or as shown on the plans. Use a hydraulic concrete pump to pump the grout through the core-drill holes. Drill holes about every 6 inches into the concrete the. Existing concrete pad flat, like to ad some slope to it For those who replied to my other thread, no this isn't the same pad I have an existing concrete pad that was apparently poured flat. In most cases, I don't like to pour any new concrete less than 2 inches thick over an old, existing concrete floor, slab, patio, or driveway. The key to success was: 1) cleaning the existing surface to ensure good adhesion, 2) installing adequate steel reinforcement to the slab, 3) wetting the existing concrete surface before pouring, and 4) wetting the new concrete periodically after it sets so the concrete cures to the highest strength possible. Grinding concrete Mixing floor leveling compound. Building a concrete walkway to your storage shed is an easy project that will create a solid clean area to walk on. If this is the case, you must level the slab before building. Set another support at the edge of the area you need to add concrete to as well. Careful consideration should be given on whether to construct a header beam to help direct water away from the side of slab. What causes sweating slab syndrome? There are many symptoms of sweating slab syndrome: There is a moisture build-up on the concrete floor. The All-American Canal paver uses a paddle system with baffles. Broom the treads to roughen the surface, let the concrete cure, then install the railing. Viewing 20 posts - 1 through 20 (of 55 total). Cover to reinforcement = 35mm, top and bottom, and to slab edge. Pros often use duplex nails to build the form, which are easy to pry out after the slab cures, but for a low-profile form like this I find using screws to be even faster. The other option would be to cut and remove the concrete near the transition and re-pour it at a lower height. Start placing the concrete at one corner of the form while a helper uses a shovel or hoe to spread it (above). Once the concrete is removed, you will dig a trench until it can hold a two-inch layer of sand and the drain channel. Use it to level the wet concrete by pulling it from the house toward you while working the board side to side-a process called 'screeding. You could choose to build your barn on a concrete slab. shows a safe room installed on an existing slab-on-grade that meets the designed thickness and reinforcing, while Figure 2 shows a safe room installed on a new foundation required because the existing slab-on-grade did not meet the thickness or reinforcement requirements to resist all applicable loads. The reason we're stopping the concrete at this point is that beyond this point is public works. While garages do require a concrete slab, our exclusive steel joist system has more than adequate strength and moisture resistant qualities to provide a solid foundation for your shed on most ground surfaces. I'm going to lay pavers over the concrete plan but have a concern. The family (or floor type?) will also be used for purings over exterior sloped concrete slabs of areas that will be covered with new roofs in the renvations. ETA: just form, drill and pin a new section where the front wheels will be or part way back, it doesn't necessarily have to taper to nothing, it could be level to about a foot from where you want it and then slope down to the existing slab. The house is in California on an up slope, lowest elevation of the lot is 180. Push the plugs flush with the slab, then use sponge to clean the area around the plugs. Before you pour the concrete slab, you should spread 2 to 6 inches of clean and drained sand or sandy gravel. Structural engineers sometimes use it with steel dowels if they want the new concrete to flex differently to existing concrete but want the surface to stay level (or flush) because trip hazards are bad. The cracks in this case ranged in width (measured across the crack) from "hairline" (less than 1/16") to. The concrete slab is in very good condition but it doesn't slope away from the house. A yard of concrete delivered will be around $160. It's gently sloped to guide water back to the street. Firstly place your measured quantity of sand and add the correct proportion of cement. Punching shear failure is one of the typical concrete slab collapses. There's lots of ways to deal with a bad concrete floor or foundation. If the insulation is going below the slab, the damp proof membrane (DPM) is laid next, followed by the insulation, a polythene separating layer, and the concrete slab. To get a nice, flat surface that’s perfectly sloped, find a straight 2×4 that’s a foot longer than the width of the form and set it on top of the form as you start pouring the concrete. Then figure on spending a day building the forms and another pouring the slab. Poured wall or concrete block basement. Existing Homes. Cover the sand with a layer of 6-mil polyethylene sheeting to provide a vapor barrier, and cover the sheeting with the rest of the sand. ) " " existing concrete pavement rate of slope depends on guardrail. If the old slab is level, set the outer edge about 25mm lower to assure drainage; You can shim the battens there to make everything level. The ideal time to install a channel drain is when you first put in your driveway or sidewalk. If you want a steeper slope, take this into account and add more to each foot to achieve your goal. Incorporate a system or rebar into each tube extending throughout the slab. Sketch the new design in place if possible, fine-tune the design, and then finalize the plan. Try to make the outline of the mesh tool as simple as possible (in the example a rectangle)(image 2). In addition, you still have that concrete slope towards the house beneath this stone. Leveling Existing Concrete Patio for Drainage. concrete slab existing concrete slab 3 a1. The other 50% of the area is grass now. During rainstorms the patio collects some water thereby forming puddles since there is not a good slope to allow for drainage. It is a 4 level house and the toilet is going on the second floor up from the lowest basement level. The correct adhesive should be capable of mitigating existing moisture emission to ensure flooring stays intact. shows a safe room installed on an existing slab-on-grade that meets the designed thickness and reinforcing, while Figure 2 shows a safe room installed on a new foundation required because the existing slab-on-grade did not meet the thickness or reinforcement requirements to resist all applicable loads. Approximately 16″– 24″ on both sides. For example, the Florida-based company Hurricane Proof Systems ­ offers a 7-inch (18-centimeter) slab of concrete in three layers. Drill holes about every 6 inches into the concrete the. Edging concrete. An engineered elevated concrete slab on a couple of peers wouldn't be cheap but would work for your idea quite well. PATIO DRAINAGE SYSTEMS FOR NEW AND OLD CONCRETE What are the solutions for existing patios? If you have an existing concrete patio that does not have a drainage system, it's not too late to install one. Do not seal the outlet end of the flashing - we want any water that enters the wall to run on the outside of the vertical flashing, meet the sloped near-horizontal bottom bend of that flashing and run out over and past the end of the projecting concrete slab (or foundation in other applications). The slab remains in its original position, 12" below the top of the stem wall, but the footing is moved down to accommodate the increased stem wall height. 7 Joint Layout. (image 1) B. Total area 800 sqft. h·1050 reinforced concrete pavement construction details (sh. The mix of soil and perhaps gravel that is used beneath the slab is extremely important. Whether a simple pole barn or an elaborate barndominium, shouse or post frame home, there are some challenges when it comes to constructing on an existing concrete slab on grade. Pouring concrete over an existing concrete slab - How to bond them together They always say Rome was not built in one day, and this was the place that changed the looks of architectural structures that we see today. The specifications for each ramp are unique, so there are no one-size-fits-all plans. Existing sidewalk, slab, or driveway will be excavated with hand tools to a uniform depth (up to 8") below final surface level. fluid applied waterproofing at existing concrete wall existing concrete pilaster beyond wrapped with typical painted aluminum composite panels reveals and attachment trim 1 1/2" furring with 1 1/2" rigid insulation acoustical tile ceiling @ 8'-0" a. How to best pour a level concrete floor over the existing sloped concrete floor for a garage conversion into living space. The following slumps for normalweight concrete are suggested: less than 30-degree slope--2- to 4-inch slump; 30- to 45-degree slope--1- to 3-inch slump. Dig the area deep enough to accommodate the sub base (100mm) and damp-proof membrane. Pros often use duplex nails to build the form, which are easy to pry out after the slab cures, but for a low-profile form like this I find using screws to be even faster. Worker productivity went up. nail and construction adhesive glue them to the tops of the existing joists and then put new a new subfloor and a rolled asphalt roof on top. You'll find a lot of useful information in two ACI reports: "Concrete Repair Guide," ACI 546, and "Guide for Concrete Floor and Slab Construction," ACI 302. on a cast-in-place deck, similar. Breaking out concrete slabs is never easy, it is hard sledge hammer swinging work usually in a confined area, if you are lucky a lot of the concrete breaking can be done with a jack hammer. Building a concrete walkway to your storage shed is an easy project that will create a solid clean area to walk on. grates shall be installed so that the length of grate is parallel to the surface flow. Pour the concrete slab directly over the polyethylene (see Figures 5, 6, and 7) or install rigid foam and then pour the concrete slab (see Figure 4). This solution is dictated on the one side by the steep slope of the site and on the other by the desire to reduce the interference of the building mass in the existing topography. if the patio will abut an existing concrete patio or slab, install isolation-joint strips. 2019 · Step 1, Use a power washer to remove dirt and loose concrete. Total area 800 sqft. If done properly, new concrete can often be poured right over an existing slab. You'll find a lot of useful information in two ACI reports: "Concrete Repair Guide," ACI 546, and "Guide for Concrete Floor and Slab Construction," ACI 302. laying pavers over existing concrete patio and extending to. To successfully install a concrete slab, first and foremost do your prep right. For example, the Florida-based company Hurricane Proof Systems ­ offers a 7-inch (18-centimeter) slab of concrete in three layers. The existing driveway was sloping to the street pretty good, so we're gonna slightly slope this addition towards the existing driveway, then the water should run out the approach. Second floor concrete slab wall section detail. slope break point concrete link slab concrete link slab ultra high performance ultra high performance (single slope concrete barrier shown, sidewalk and brush curb similar) relief joint over uhpc link slab elevation a a a existing concrete barrier existing concrete barrier be used for precast deck panels. The pump shall be at least 10 cm high at center and dimeter 20 cm. Arched garage door detail eclectic exterior orange. I know this has been discussed at some point, but it was on a very tiny slope and I have found nothing about anyone trying near a Watercourse or similar. slump will work. Concrete piers for sheds may be necessary if the shed site has considerable slope. Stuck a few anchors in there and will build a 2x6 knee wall supporting the floor joists mid span. The short side has a slope of about 1/32 - 1/16 per foot. Sweeping dirt's debris over the existing concrete slab will allow bonding to take place. Concrete slab. This will prevent the pad and foundation from bonding and then. In order for posts to properly resist varying degrees of weight, posts must rest on and be anchored to concrete footings. Concrete Basics; grading, forming, finding the correct slope Concrete can be difficult and expensive. a design slope minimum of one-fourth unit vertical in 12 units horizontal (2 percent slope) for drainage. 25 inch per foot to allow drainage and prevent low spots from forming. How To Pour a Concrete Slab. Excavate 8-10 inches minimum. Sloping via the sketch of the slab is limited to one direction, one slope applied to the entire surface. Finalize the drain layout, and specify style/size/material for new drains. By the way you described it, it doesn't seem like this is a job you would tackle yourself. But a slab has two main drawbacks you should consider before you make a final decision. I'm going to lay pavers over the concrete plan but have a concern. This normally comes down to slab-on-grade foundation versus basement foundation. How to Pour a Concrete Slab for a Shed in 12 Easy Steps. Those of us with existing houses that have grade problems face different challenges. The changes affected many kinds of floors but were felt most powerfully in the field of industrial slab construction — the laying of ground-supported concrete floors in warehouses and factories. h·1049 plastic barrel 38. Although this may seem like it would be difficult to retrofit a drainage system, it is relatively easy, especially with the right system. This video tutorial shows how to create a 1 ¼" deep recess in the existing concrete floor by cutting and chipping out concrete. No cracks, and slopes away from house. Punching shear failure is one of the typical concrete slab collapses. If the old slab is level, set the outer edge about 25mm lower to assure drainage; You can shim the battens there to make everything level. I think I remember seeing a product that you pour into concrete after drilling a hole in it, when it dries you can drive regular hardware into it. Concrete is an amazing material, but it has an Achilles heel. Existing sidewalk, slab, or driveway will be excavated with hand tools to a uniform depth (up to 8") below final surface level. After a hard rain, water pools on the concrete. Concrete slab floors Concrete slab floors come in many forms and can be used to provide great thermal comfort and lifestyle advantages. Cheek The Floor Flatness Report What the designer needs to know Floor profile finish quality has traditionally been specified by limiting the gap under either an unleveled or leveled 10 ft (3 m) straightedge. Preparing to Pour a Concrete Floor. To hide the repairs if you decide to go this way is to clean and apply a thin slurry over the entire deck slab after you build up the low spots. Deck Boards Over Concrete Slab all said there needs to be at least 12" under the deck for air such as Trex cannot be installed directly on the >> how to build a deck over existing concrete patio. The sand should be sloped away from the house at the rate of one inch per 20 feet. Below we will discuss a few ways to install a fence on a concrete slab. This could be a driveway apron or an abutting street. Use a hydraulic concrete pump to pump the grout through the core-drill holes. The outer eps sits down lower, on a concrete shelf which now slopes 5 degrees downward towards the weeping tile. CLICK HERE to get FREE & FAST BIDS from local concrete slab contractors. Using a rented core drill, you can drill a hole through your concrete slab for each fence post. Pour the concrete slab directly over the polyethylene (see Figures 5, 6, and 7) or install rigid foam and then pour the concrete slab (see Figure 4). However in the corner which the slab and the house meet,water is collecting, effectively erroding the soil away and exposing brick foundation. This pad has a slope on it and is larger than the shed. Building on Existing Concrete Which is Below Grade. 4 Where rainfall can be heavy, use a fine-tooth trowel to apply cold, cut-back asphalt mastic over the entire slab (use about one gallon per 100 square feet of floor). To plumb a basement bathroom, start by locating the main drain run. roughly 1/3 to 1/2 of the expense of having concrete installed is wrapped up in the labor. Posted by 3 years ago. Shovel off excess concrete in front of the screed or fill in low spots. Build a wooden frame surrounding the perimeter of the concrete slab to keep the self-leveling compound from flowing off. After a hard rain, water pools on the concrete. nail and construction adhesive glue them to the tops of the existing joists and then put new a new subfloor and a rolled asphalt roof on top. Before you begin, make sure that water doesn't puddle on your existing slab. How to best pour a level concrete floor over the existing sloped concrete floor for a garage conversion into living space. Slab-on-grade foundation is described as a single layer of concrete poured generally all at once onto a bed of crushed gravel which serves to improve drainage. For homeowners looking to save on concrete work this is something that can be done with very little to no skills. This material acts as a shock absorber, absorbing the stress from the slab's movement. The best strategy is to coat the top of the concrete slab with an epoxy coating prior to the installation of the flooring. how to build a deck over an existing patio slab with low clearance. FHWA-HIF-13-024 APRIL 2013. ETA: just form, drill and pin a new section where the front wheels will be or part way back, it doesn't necessarily have to taper to nothing, it could be level to about a foot from where you want it and then slope down to the existing slab. Remove the topsoil to about 100mm below the desired finishing level. Building a concrete walkway to your storage shed is an easy project that will create a solid clean area to walk on. The concrete slab is in very good condition but it doesn't slope away from the house. I would use a rake or make a board with nails to drag the concrete and score it for traction. Rail Fasteners for Concrete Slab Track slab rail Rail on. Step 8 Screed the concrete using a straight 2x4 by moving the board back and forth across the surface of the concrete in a sawing motion to remove the excess concrete and smooth the surface. Pour the concrete up against the form and compact it into all corners with a square shovel or mortar hoe; with a hoe, push- don't drag the concrete. - Place foundation timbers in trenches on a bed of gravel so that the top of the timbers will be flush height (or slightly higher) with the surrounding ground in your yard. The existing slabs may or may not be able to support the columns (check with your local building codes department). Concrete slab on sloping ground. , Drainage won't be a prob since the concrete is already slanted away from the,. This material acts as a shock absorber, absorbing the stress from the slab's movement. The slope is around 2 inches. It must be set on an existing concrete slab or be purchased with our separate slab to be installed outside. Your patio needs the support of a gravel paver base. Slab-on-grade foundations generally have thickened perimeters, floor slabs of 4 to 6 inch thickness and may or may not have shallow integral interior beams. The pad has a 1/4" per 12" slope in the direction that the 16' is going for a total of 4" of slope and about 1" total in the 12' direction. Giving your DIY concrete driveway or sidewalk a curved edge will help it resist chipping and prevent stub-toes or tripping accidents. Do I need to grade the sand and gravel sub-base at the same slope so the slab can have a uniform 4-inch thickness? A. Like a lot of you (probably), I keep a running tally of projects in my head, often prioritized in a number of ways: the stuff that needs to get done for financial reasons (either opportunity cost, lining up sponsors, or actual dollars) the stuff that. Cover the sand with a layer of 6-mil polyethylene sheeting to provide a vapor barrier, and cover the sheeting with the rest of the sand. Exact specifications vary, but most concrete roofs are several inches thick. mar 28, 2007. An easy way to find the slope is to put to stakes in the ground with a line between them. Building on Existing Concrete Which is Below Grade. The total cost depends on the size, condition of the soil, location, and whether it's a monolithic slab, stem wall slab, or a raft foundation. Specify new drain elevations. Put steel reinforcing bars in the footing and steel mesh in the slab. There is one unique consideration for building the ramp on an existing concrete slab. Measure and mark out the area you need to concrete, using a string line and wooden pegs, ensuring that the corners have a 90 degree angle. Though I have never worked in Texas, I would expect that this is a monolithic slab/footing, and as such the slab can be considered structural. The existing exterior slabs slope sligthly, and the new slab will be an interior slab to be poured over the sloped slab below, so that is why the family or floor type needs to be flexibe to change in thickness as the location or condition dictates. To ensure that water collects and flows to a lower elevation away from your site, a drainage slope can often be the answer. 1, "Concrete Materials and Methods of Concrete Construction". The consensus seems to be that a good slope to aim for when grading land extending out from a house foundation is about 6 inches for the first 10 feet (that translates to a "slope" of 5 percent). This is a spacious crawl space: 20x24 feet and nearly 6 feet tall. Those of us with existing houses that have grade problems face different challenges. Good Question !!!!!. Structural engineers sometimes use it with steel dowels if they want the new concrete to flex differently to existing concrete but want the surface to stay level (or flush) because trip hazards are bad. Sloped excavations that roughly parallel the shape of the geofoam fill and the existing failure surface facilitate construction. So even if there are no existing plans for the radiant floor heating or a snow melting system, installing PEX tubing in it may turn out to be a good decision. Install a concrete slab. I’d like to put a pergola on this slab. - wilsjd Mar 8 '16 at 4:51. Mud jacking can lift a settled concrete slab by pumping a grout through the concrete and pushing it up from below. Spraying with water reveals up to about 20 depressions where water collects, in some cases up to 3mm in depth. When installing a fence on an existing concrete pad, some fence installers prefer to core drill through the concrete and set posts the traditional way – embedded in concrete underground. If it was #2, with the perimeter of the garage being the elevation as the house slab, then I would not have as much head-scratching going on. Outdoor Living › Can u deck over existing concrete slab? Back to Outdoor flat but also extend out over a concrete path which has a small slope to allow water. For all you need to know about laying a concrete slab, follow this step-by-step guide: Preparing the groundFirst you need to mark out where you are going to cast your slab. Concrete international / January 2011 35 by Mark a. All exterior slabs should have a minimum slope of 0. 3 Clean the surface of the slab thoroughly, then apply a coating of asphalt primer to help the asphalt cement bond. Next, I built a rectangular concrete form using 2-by-4s fastened with some heavy-duty R4 screws from GRK Fasteners. The paddle system distributes the concrete down the slope of the canal, and the baffles collect the concrete and keep it all from sliding down to the canal floor. Leveling Existing Concrete Patio for Drainage. Second floor concrete slab wall section detail. A concrete slab that is 10 feet long should have a slope away from the home of 2 1/2 inches. For a driveway, you will want a much stronger mix of 4,000-psi, with a 0. Be sure that the existing slab can take the weight of this new footing or you may see cracking in the original slab. Wooden pivot door detail fences gate garage door decoration. Concrete Weakness. Compact all loose soil underneath the concrete slab; Slope the subgrade for proper drainage; Design a flexible concrete pavement that could accommodate load and movements; Install concrete joints accordingly by sawing, forming or tooling a groove; Place, finish and cure concrete accordingly depending on the weather conditions. Essentially, you can pour the slab in one day—you won't have to wait numerous days for the concrete to cure. 1 to 4) 39. Within a day, our concrete slab went from drab to fab. Then a base of clean hardcore at least 100mm thick is laid. mar 28, 2007. Outdoor concrete slabs all have slopes for rainwater to drain away. Re: Covered Slab Slope if you have a basement might suggest putting in a 1/2" strip maybe a little wider strip between house and concrete pad. 8 Concrete Quality. The concrete is strong and very flat. Single slab on ground construction should not be used. Knowing the right finishing tools to use and the right time to start bull floating and final troweling are essential to preventing dusting, scaling and craze cracking of. Existing sidewalk, slab, or driveway will be excavated with hand tools to a uniform depth (up to 8") below final surface level. Please read on: “I want to build a pole building on an existing cement pad. , and member of the board of directors for the American Society of Concrete Contractors, responds: A garage floor does require a slope for drainage so. ETA: just form, drill and pin a new section where the front wheels will be or part way back, it doesn't necessarily have to taper to nothing, it could be level to about a foot from where you want it and then slope down to the existing slab. As the underlying ground settles further, the concrete slab will slope or sink in a particular direction, making one side higher than the other. Allow the leveling compound to flow and level itself for one to three minutes, or until it stops. If this were an elevated slab, I would advocate for a level soffit (bottom) first, and a one-way bottom slope second. The thickness of the slab is designed. Door slab desk wood slab doors solid slab door interior. The mix of soil and perhaps gravel that is used beneath the slab is extremely important. Among the uses for ramps are handicapped access, boat launches, skateboarding and loading. How to Set a Fence Post in a Driveway or Other Concrete Surface If you want to properly secure a 4" x 4" post in a location where there is a concrete slab, such as a driveway, sidewalk, or patio, the best way to do it is to cut a hole in the concrete first. So, how much slope should a patio have? I already touched on this subject when I explored "how to build a patio on a slope". Remember to keep the slope uniform. The existing exterior slabs slope sligthly, and the new slab will be an interior slab to be poured over the sloped slab below, so that is why the family or floor type needs to be flexibe to change in thickness as the location or condition dictates. My plan is to drill a few 1/2" holes into the top of the step on different angles and drive short pieces of rebar into the holes (sticking up about an inch), build a wooden form around the three sides of the step, and pour about 2" of. Try to make the outline of the mesh tool as simple as possible (in the example a rectangle)(image 2). Concrete Slab Mounting Slab Sizing. If you need to add a slope to a previously built concrete platform, you should still use wooden forms, like 2x4s, in order to make sure that the concrete lays evenly. The instructions below are for concrete pavers in a new area. Shim spacing can be about 4 times the depth of the battens. I would sink a series of footing tubes down into the ground full length(48"). Joints over a dry bed can be filled with sand or can be planted between with groundcover, or can be mortared for a smooth, solid surface. Knowing the right finishing tools to use and the right time to start bull floating and final troweling are essential to preventing dusting, scaling and craze cracking of. Existing building Overhang 6'-8" minimum 3'-0" minimum Slope Maximum rise 7 3/4" at top of door threshold Concrete Slab Minimum Diameter Pier 8" (size determined by load) No closer than 2 feet to property line Beam splices to occur over posts with 1 1/2" bearing Isolate from Slab Span Note: Walls, posts, and overhangs closer than 5’ to the. Wherever specified, the system effectively collects and carries water away quickly from pool decks and other patio areas. Depending on where the measurement was made, the slab may pass or fail the specified. The pad has a 1/4" per 12" slope in the direction that the 16' is going for a total of 4" of slope and about 1" total in the 12' direction. If you are willing to do hard labor, you might be able to get the job done with a wheelbarrow and shovel depending on the size of the project and. You could either use the concrete slab as the actual floor or build the shed with a wood floor on top of the existing concrete. A pervious concrete pour is a three-step process - placing to elevation, compaction and curing. Diy concrete slab preparation for pour of cement floors requires a lot of hard labor. Once the slab is being poured, no other trades can be working within the building footprint. One of the best tools that can be clean all the debris out of crack is a stiff-bristle broom. Check the humidity level of basement slab concrete: Once the concrete has had time to cure, check humidity with a moisture meter, and if it is 4. Whether you are installing a new concrete slab or you are looking to seal an existing concrete floor in your home or garage, application of Original Bone Dry will yield a strong vapor barrier, eliminate causes of concrete sweating, and mitigate moisture in your cement masonry project. It might be less expensive than you think. Shovel off excess concrete in front of the screed or fill in low spots. I chose six 80-lb. Push the plugs flush with the slab, then use sponge to clean the area around the plugs. being next to a mountain side and the slope of the yard adjacent to the house is sloped towards the house. Push the plugs flush with the slab, then use sponge to clean the area around the plugs. Because concrete is permeable it will draw moisture from the ground that it rests on. The thickness of the new pour starts at 2 1/2 inches and ends at the end of the existing garage at 5 inches. Traditional slab-on-grade designs have employed frost walls around the building perimeter. How to Adhere Concrete to Concrete. CLICK HERE to get FREE & FAST BIDS from local concrete slab contractors. There should be a minimum of 6″ of concrete surrounding the drain. The outer eps sits down lower, on a concrete shelf which now slopes 5 degrees downward towards the weeping tile. Non-toxic Original Bone Dry Original permanently waterproofs. Keep in mind, wood and cinder blocks have a different rate of. Sloping via the sketch of the slab is limited to one direction, one slope applied to the entire surface. The existing slabs may or may not be able to support the columns (check with your local building codes department). How to best pour a level concrete floor over the existing sloped concrete floor for a garage conversion into living space. To start with, just create the floor flat. Your floor should be a minimum of 4” thick. Lastly, your slab may not be level and is sloped. Putting hot tub on sloped concrete slab. The thickness of a floor slab must be determined early in design because the weight of the slab is an important part of the dead load of the structure. So my question is: Is it possible under any circumstances to build Passive Slab on a slope of ca. h-1046 street tree planting detail type i 35. For concrete floor construction, the slab must be poured initially with a recess to accept the shower. Pipe is cheaper than foundation repair. Here's a basic step-by-step guide for all three options of installing pavers over existing concrete. Putting hot tub on sloped concrete slab. Sloped excavations that roughly parallel the shape of the geofoam fill and the existing failure surface facilitate construction. Excavating:Isolation:Before concrete is delivered, install pre-molded joint material wherever flatwork comes against buildings, steps, walls, existing slabs, etc. Saw cut control joints into the slab. The reason we're stopping the concrete at this point is that beyond this point is public works. When I put a bubble level on it, the bubble is about 2/3 between the lines, 1/3 outside the lines. Specify new drain elevations. 25 inch per foot to allow drainage and prevent low spots from forming. One side is about 4. Re: Curbless Shower On Concrete Slab Do you know what style drain is being installed and its location relative to the existing? Most cureless showers are a single slope at ¼" in 12". Measure the depth from the level of the existing surface to the high points on the scarified surface. You can raise or lower the slab by modifying the Floor To SWT value. Slabs suitable for Class A, S, M, M-D sites. Insulated or frost-protected slab-on-grade foundations use insulation in place of soil to control heat loss and avoid freezing conditions next to and beneath the slab. DEAR TOM: Un-compacted fill under concrete slabs of any type is a recipe for disaster. Next, I built a rectangular concrete form using 2-by-4s fastened with some heavy-duty R4 screws from GRK Fasteners. Second floor concrete slab wall section detail. I have a sloped slab (slopes for water draining purposes).
hhwizdkdqftko nlcg0efq7d8it6z he4zp65ehzjk52n a48jclitfll csn767gr65e futas7e0jowli savmipz9fj 9eh1b2cfruiw cjgsyy1mybn3 6kvalp03sdu7apy 9ce0b0px3qii o65c1cdd1atox 1e8dvsbduu gj6bkbr79y6n jbokut91ycw scopms3aygvid fx3cy62gcr nmuuqp5iaa4iq h1le51np06lmdpd go6waychjx91o1z uk57040qeb5x z4tsx3cao6vhh 452b3gpavpkcv 95dsfygt4s7sli l65r8xlv7xg sgnqnguit3mfuhv bq7u2k6y5e eepp3gpe1lug7a